Repair/Repave
Shelldance Road and Sewer in Pacifica, CA
JI Garcia Construction, Inc. was a Subcontractor
to Allright Diversified Services, Inc. on this two hundred sixty-six
thousand dollar project at Pacifica, CA. The project consisted
of pulverizing and repairing 14,800 square feet of road that lead
to the Nursery from Hwy 1 and removal and replacement of various
clean-outs, manholes and sewer lines. JIG contracted with a Civil
Engineer to design the new sewer system along with establishing
the vertical and horizontal controls for the sewer line. The replacement
of the sewer lines consisted of removing and or capping of approximately
920 lineal feet of 6" VCP with new 6" HDPE pipe. This
work was completed along a very curvy and steep slope hill. Due
to the dangers of trenching on such a steep hill JIG decided to
install 265 lineal feet of 6" SDR 17 sewer pipe using a "trenchless
method" via pipe bursting from a clean-out at the top of
the hill to a manhole in the street. We replaced seven manholes
to different depths starting at 4 feet to 10 feet before paving.
Rebuilding this road created a problem with the fact that it was
the only access road to the nursery and the tenant who lived alongside.
The road was build in stages to accommodate traffic. This project
was completed two weeks before deadline and in time to accommodate
the beginning of the tour season.
|