La Mesa Village Housing

This job consisted of 4.1 miles of petro-mat with 2" asphalt overlay. The edges required grinding to create a smooth transition at the curbs and gutters. In addition; replaced 75 fire hydrants throughout the housing complex. The hydrant replacements portion of the project required being done during the winter season to enable the paving to be completed during the spring-summer period.

The unique challenge of the project; which was located in an occupied residential area was to allow no disruption of traffic to the residential community.