Golden State Industrial
Project consisted of 30,000 square feet of industrial office space speculated for lease. In addition, 3.18 acres to be used for lay-down storage area. Read More...
Repair/Repave Shelldance Road and Sewer in Pacifica, CA
The project consisted of pulverizing and repairing 14,800 square feet of road that lead to the Nursery from Hwy 1 and removal and replacement of various clean-outs, manholes and sewer lines.
Read more...
Travis General Purpose 551
This project was an existing facility that required a full renovation both inside and out. Read more...
Naval Postgraduate School Barracks Project - Monterey, CA
This project consists of the design and construction of a new, approximately 12,271 SF, Enlisted Barracks Addition to Building 836. Read More...

 



Copyright 2002 J.I. Garcia Construction, Inc. All rights reserved.
Design and development by
Vantage Technology Group, Inc