Golden
State Industrial Project
consisted of 30,000 square feet of industrial office space
speculated for lease. In addition, 3.18 acres to be used for
lay-down storage area. Read
More...
Repair/Repave Shelldance
Road and Sewer in Pacifica, CA
The project consisted of pulverizing and repairing 14,800
square feet of road that lead to the Nursery from Hwy 1 and
removal and replacement of various clean-outs, manholes and
sewer lines.Read
more...
Travis
General Purpose 551 This
project was an existing facility that required a full renovation
both inside and out.Read
more...
Naval
Postgraduate School Barracks Project - Monterey, CA
This project consists of the design and construction of a
new, approximately 12,271 SF, Enlisted Barracks Addition to
Building 836. Read
More...